If the first one doesnt look good, there's this 4 nodes later, so about 18 feet, and 24 secondaries probably. Also right near the optimal windows, just a little late, probably June 25th
The 2501 also should be around then, but the 1838 and the 2464 will be at least a week behind, hopefully early July.